Due to a local power outage, orders placed today that contain UK-held stock will be dispatched from tomorrow at the earliest. We apologise for any inconvenience.
That depends on the size of the pool and the ambient temperature of the air outside. An initial heating period usually takes 3 to 4 days. After that, the heat pump only needs to work a few hours per day to keep the water at the right temperature.